David was involved in this one off new build home after planning permission stage and was responsible for leading and developing the complete technical design and coordination with the on site construction.
This was an scheme full of complex details such as full wrap around timber cladding, seamless glass links, natural stone cladding, cantilevered opening glazed corner windows, along with a detached swimming pool building formed out of waterproof concrete with deck level pool - all heated by borehole ground source heat pump.